VISAKHAPATNAM: Kia India will build a second car plant in Andhra Pradesh. Managing Director and CEO Gwanggu Lee signed an MoU with the state government on Thursday at the 31st CII Partnership Summit in Visakhapatnam, in the presence of Chief Minister N. Chandrababu Naidu. Kia said the investment would be about $2 billion, including its supplier partners.

The new plant

  • Site: 465 acres at Erramanchi in Sri Sathya Sai district, next to the existing plant at Penukonda
  • Capacity: 2 lakh more vehicles a year, taking Kia's total from 4.3 lakh to 6.3 lakh
  • Jobs: about 12,000 direct and indirect
  • Output: from early 2030; both combustion-engine and electric models, with stamping, welding, paint and assembly shops

Lee said the company was investing more because of its trust in the Chief Minister and the state government. Naidu asked Kia to also set up a design engineering centre, a global capability centre and a battery research centre with IIT Tirupati.

The Penukonda plant, started in 2017, was commissioned in 14 months. It produced 3.17 lakh vehicles in 2025–26 and exported 27,953. Kia has not given a construction start date for the new plant.