An IT employee residing in Madhapur faced difficulties two days ago due to a power outage. The power went out at 10 AM, just as the employee opened a laptop at 9 AM to prepare for a meeting with a client in the United States. The employee was concerned as a project needed to be submitted by the afternoon.

The router stopped working immediately after the power went out. The employee tried to complete the work before the laptop battery ran out. However, the power, which went out at 10 AM, was restored only at 4 PM. The six-hour power disruption caused an interruption to the employee's tasks.