Kothagudem Mayor Mood Ganesh has directed officials and contractors to accelerate the construction of stormwater drains to prevent flooding in Kothagudem town. He emphasized that the works must be completed according to quality standards.
On Wednesday, Mayor Mood Ganesh, accompanied by local public representatives, inspected the ongoing stormwater drain construction works along the national highway in the Ramavaram area, covering the 15th and 16th divisions.
The construction of this drain is being undertaken at an estimated cost of approximately 40 lakh rupees. The Mayor personally oversaw the progress of these works.
Officials stated that the construction of this drain is crucial to prevent water stagnation and inconvenience to the public during rainfall in the town.
The Mayor expressed his desire for these works to be completed swiftly and with quality, providing a permanent solution to the flooding problem faced by Kothagudem residents during the monsoon season. This will bring significant relief to the town's inhabitants.



